Case Study

Rigging and Setting of Geminis Lathe GM7

MEI Industrial Solutions

MEI rigging services team safely installs GM7

The MEI rigging services team was brought on to a project to transport and set in place a machine, the first of its kind in the United States. The Geminis Lathe GM7 arrived at the port of Charleston, SC, and made the 127-mile journey to Florence, SC. In a wood shipping crate, the Geminis GM7 weighed 117,731 lbs. and was approximately 43.64’ L x 15.42’ W x 13.52’ H, requiring heavy haul transportation services. With an escort and bucket truck for tree trimming, the trip took 9 hours to the job site. Before the arrival of the machine, MEI had to devise a plan to get the machine into the medical manufacturing facility. Teams created a hole in the building wall to get the machine in, along with a dock to set the machine on and skate into the building.

Heavy machinery being rigged and set up for industrial use by MEI Industrial Solutions.
Heavy machinery being transported for rigging and setting at a construction site by MEI Industrial.