Install of a Pedestrian Bridge

MEI won a project to install a new pedestrian bridge at Lemmon Ave. on the Katy Trail. The bridge was installed in two sections, each measuring 52 feet long and weighing 18,000 lbs. Our team utilized a 60/80 Versa Lift and completed the project with assistance from our partner, Crocker Cranes.

The purpose of this new addition is to provide a safe pathway for both bikers and walkers. We’re honored to have been a part of this project and look forward to the community enjoying the bridge.

Heavy machinery moving and rigging for bridge construction by MEI Industrial Solutions.
Workers in safety gear perform heavy rigging near a colorful pedestrian bridge.