Grizzly Conveyor Installati­on

MEI Industrial Solutions
Case Study Filters

Limited headroom due to a beam obstruction

A local recycling company contracted A&A to handle the installation of a new Grizzly Conveyor and the removal of an existing model. There was a challenge, however, with limited headroom due to a beam obstructing the front of the conveyor.