Case Study

New System Install w/ 25,000 lb. Boiler Replacemen­t

MEI Industrial Solutions
Case Study Filters

Old system comprised several major components

A&A was contracted by a metal recycling plant to carry out the replacement of an old system with a newer version. The old system comprised several major components, with the largest being a 23,000 lb. boiler situated on the second floor approximately 18 feet above ground leve.

Heavy industrial machinery being moved or installed by MEI Industrial Solutions with heavy rigging.
MEI Industrial Solutions crew operating heavy-duty forklifts to transport and install a 25,000 lb boiler system indoors