Case Study

Pre-built Utility Module Retrofit

MEI Industrial Solutions
Case Study Filters

Two Month Install Project

MEI Industrial Solutions, formerly MEI Rigging & Crating, successfully tackled a new installation challenge that represents the future of new or refurbished factory construction.

The two-month-long, retrofit project involved moving and lifting one hundred and fifty 8 feet x 32 feet, utility modules that are set and bolted onto elevated steel. The average weight of the modules is about 4,000 pounds, with the heaviest being 6,200 pounds.

Pre-built-Utility-Module-Retrofit-Project